A staff WC and staff workstation
TMV’s have been installed to all hot water outlets set at 39deg.
Induction Hobs
Window restrictors
New gas boiler and wet heating system
Emergency lighting
100% rewire
Plastering with full redecoration
The basement has fire lined
Thumb turns to all lockable doors, including the basement, and cupboard doors
Ground floor main entrance door leading to stairwell, kitchen & lounge with rear door providing access to a closed in garden